Teejet Fieldware Tool Instrukcja Użytkownika Strona 27

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 48
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 26
23
Fieldware
®
Tools
98-05048 R3
The Job Setup Dialog
The Job Setup dialog (Figure 31) is where you can select Job related information you want included in the
Application Report. Dealer, Customer, and Application names are stored in their associated proles. If you need to
create or edit any of these elds, press the NEW button to launch the Build Prole application.
Figure 31: The Build Report Job Setup Dialog
The Document Setup Dialog
The last Build Report dialog is Document Setup (Figure 32). In this dialog you can select a Dealer logo (JPEG
& BMP formats) that will be included in the application report. The Build Report As button will let you name the
report and save it where you like, much like a Save As option in any Windows program. The Build Report button
(recommended) builds the report based on the name of the record (.RCD) le and save it in the same folder
that the record (.RCD) le is stored. The name of the report and where it will be saved is displayed in the Save
Path window. After one of the Build buttons is pressed, the Report View dialog is displayed showing you the nal
Application Report. From this dialog you can zoom and pan as well as print the report.
Przeglądanie stron 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 47 48

Komentarze do niniejszej Instrukcji

Brak uwag