Teejet Fieldware Tool Instrukcja Użytkownika Strona 37

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 48
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 36
33
Fieldware
®
Tools
98-05048 R3
In (Figure 40) we see the Field Transfer dialog. This
dialog is used to congure a single eld transfer.
The left-hand portion of the dialog denes a source
eld which will be transferred to the destination eld,
dened to the right. Each eld setting on the left is
followed by an arrow button and a matching eld
setting on the right. When active, the arrow button may
be used to transfer the contents of the left setting to
the right. Pressing the Copy button at the bottom of the
screen is equivalent to pressing all of the active (not
grayed out) arrow buttons.
The top pair of settings are used to dene the names
of the elds. These settings may take the form of a
combo box or an edit box. If a combo box is present,
you may select one of the names from its list. The
list contains all the names located in or compatible
with the eld. If an edit box is present you must type
in the name of the eld. In (Figure 40), we selected
ELEVATION as the source eld’s name and entered
ALTITUDE as the destination eld’s name.
The second pair of settings dene the eld’s types.
These settings take the form of either a combo box or
a text box (can’t edit). If a combo box is present, you
may select the type you wish to associate with the
eld. This affect how the eld is written to the le when
the conversion is performed. If a specic TYPE
is listed in the box on the left it is best to
chose the same for the box on the right.
In (Figure 40), we selected Double as the destination
eld’s type.
Figure 41: The Build A Unit Of Measure Dialog
The nal pair of settings assign units of measure to
the elds. These settings take the form of either a
combo box or a text box (can’t edit). If a combo box
is present, you may select the unit of measure the
eld is (or will be) stored in. Take care in selecting a
unit of measure. If the eld denes a name or some
other non-numeric value, specify <None> for the
unit of measure. If you don’t know the eld’s unit
of measure, select <Unknown>. When the eld is
transferred, all necessary unit of measure conversions
are automatically performed. Therefore, it is important
that the source eld’s and destination eld’s units
of measure are compatible. If you have entered
incompatible units of measure, you are presented
with an error when you press OK. In (Figure 40), we
selected feet as the destination eld’s unit of measure.
If the Unit Of Measure setting has a Browse button to
its right, you may opt to build a unit of measure for the
eld. Pressing the button brings up the Build Unit Of
Measure dialog (see (Figure 41)). This dialog allows
you to select or compose a UOM (unit of measure)
from a long list of options. If you wish to select a UOM
from the list, you may type the UOM’s name in the
“Unit Of Measure” edit box or nd the UOM in the list.
Conguring A Field Transfer
Przeglądanie stron 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 47 48

Komentarze do niniejszej Instrukcji

Brak uwag